120TPH Granite Concrete Production Line


Background of the project

 

  • Name: 120-150 granite crushing production line
  • Country: Myanmar, Mon State
  • Production time: March 2014
  • Material source: quarry
  • Material Type: Syenite and Gneiss
  • Maximum feed: 400mm
  • Stone hardness: 6-7
  • Production: 120-150TPH
  • Working hours: 10 hours a day
  • Discharge size: 0-4.75, 4.75-12.5, 12.5-25, 25-59mm
  • Material use: Jianlu

Project difficulties

The stone is very hard

Solution

Device Configuration:

YG938E69: ZSW938+PE600*900
Y3S1860HP220: Y3S1860+HPC220

Process flow:

The raw materials first enter the PE69 through the vibrating feeder on the YG938E69 mobile equipment for primary crushing. After the primary processing, the materials are transferred to the second mobile device Y3S1860HPC220 through the belt conveyor, and the first belt conveyor first transports the materials to the Y3S1860 for the primary screening. The larger material is crushed by HPC220 cone to carry out secondary crushing. The crushed material is conveyed to the first belt conveyor by a belt conveyor, and then the first belt conveyor is transported to the sieve to continue to screen out the finished material.

Related case

> Granite Crushing System Price

> Granite processing machinery

> Cost of Granite Crushing Equipment

> Granite Crushing And Screening Production Line

> Granite Cone Crusher Price

Inquiry